REFERENCES

2011

Pelco cctv project for Abu Ghraib Camp –Ministry Of Interior – West of Baghdad . we Install CCTV System consists of 16 Pelco PTZ Camera and 16 Fixed Pelco Camera at Fence of Camp 2400m X 1500m Area

2011-2013

Installations of 30  Extra Low Voltage Systems such as Fire Alarm, Public Address PAGA , Access Control, Structured Cabling for Data and Voice, TV Networks

2014

Installation of Power Generation Plant 275KVA and 7 Various Control Boards and 2 Emerson UPS 100KVA and 100 Industrial Outlets for Exxonmobile DS7 at West Qurna 1 Oil Field. Basra Iraq

2015

Iinstallation of Main Data Center with Raised Floor At Petronas Garraf Base Camp GBC included 3 Stulz Smart Cooling System Each 36KW and APC UPS 40KVA and FM200 Gas Fire Fighting System

2016

Supply and Installation Of 25 MV/LV Kiosk 1000KVA at Abu Dasheer South Of Baghdad including Connections Of 11KV Cables 3X150mm^2 and Earthling System for Each Kiosk

2018-2020

Installation Of  (F&G) Fire and Gas Detection and Alarm System Consists of 3000 Items at Zubair Power Generation Project at Burjesiya-Zubair Basra with ENI as Contractor and GE as Subcontractor .

2022

Installation of Vertiv UPS 500KVA with 288 Battery Bank of 12VDC/200AH to Give 3 Hours Back up for Data Center Total Consumption 200KW we also Install 3 Way UPS 400Amp and Efficient Earhling System

Work Done at Amentum PAE Iraq / USA Embassey.

2023

Installation Of 28 Solar Power System for Residential in Baghdad of 3/5/8/12 KW. Solar Panel are from Trina Solar 580W – Hybrid Inverters are From Victron Energy 3000VA -5000VA-8000VA-1000VA Model MultiPlus

2024

Installation of Small Power [ Sockets and Lighting] Network with Medium Power ( Control Boards) and High Power System ( Transformers and Main ATS and High Power Bus Ducts) for 4 Residential Towers at Royal City –Mansour Dist./ Each Tower of 28 Floors